Advanced ImagingRP-CT1 podNewPreliminaryLicensed service
Imaging CT
40-row CT for Port Health diagnostics, in one pod.
Schematic layout (preliminary), drawn on the 12'-0" × 40'-0" pod (11'-0" × 39'-0" interior) · ~430 sq ft · dashed walls mark where the next pod connects
What it adds
- Scan room for a United Imaging uCT 528, larger than the 9 m² (approx. 97 SF) minimum installation area
- Control room beside the scan room, with a shielded viewing window
- Equipment area for the CT cabinets and power distribution
- Patient change area opening into the scan room
Building systems
- Radiation shielding
- Dedicated power
- HVAC heat load
- Reinforced floor
Rooms
| Patient Change | 44 SF |
| Scan Room | 165 SF |
| Control | 55 SF |
| Equipment | 55 SF |
Furniture & equipment
- • United Imaging uCT 528 CT scanner (40-row)
- • Patient table
- • CT control console and workstation
- • Shielded viewing window
- • Operator chair
- • CT equipment cabinets
- • Power distribution unit
- • Change bench and lockers
- • Lead apron rack
Preliminary. Confirm with vendor site-planning guide.
Fit check
| Pods required | 1 pod |
|---|---|
| Floor area | ~430 SF |
| Point load | CT gantry, 1,800–3,500 kg |
| Power | Dedicated supply; HVAC heat load |
| Shielding | Lead, calculated by a physicist |
Preliminary. Confirm with vendor site-planning guide.
Equipment values
UnitPreliminary
United Imaging uCT 528 (40-row CT)
Minimum installation areaPreliminary
9 m² (approx. 97 SF)
Gantry weightPreliminary
1,800 to 3,500 kg (typical CT), taken as a concentrated point load
Every value above: Preliminary. Confirm with vendor site-planning guide.
Design notes
- Lead shielding: a qualified physicist calculates the thickness and extent for the site and workload
- Dedicated power supply for the CT
- HVAC sized for the CT and equipment heat load
- Floor reinforcement under the gantry for the concentrated point load
Add Imaging CT to your clinic
Configure in 3D and reserve your engineering and production slot.