How it works
From immediate need to a building that keeps growing.
Every RESPAND project follows the same six steps, whatever the building is used for. Factory production and site preparation run in parallel, and expansion is planned from the start.
Six steps
How a project runs
- 1
Define
Site, users, first-day requirements and how needs are expected to grow.
- 2
Configure
Select the modules needed on day one and plan the phases that follow.
- 3
Engineer
Finalize layouts, structural criteria and building services for the jurisdiction.
- 4
Build
Factory manufacture and integration; test specified systems before shipment.
- 5
Deliver & commission
Place modules, connect services, commission systems and hand over the building.
- 6
Expand
Add modules as demand, funding and needs grow.
From factory to site
Built for transport. Built for placement. Built to expand.
- Step 1
Built & tested in the factory
Structure, finishes and specified systems completed and tested before shipment.
- Step 2
Shipped as finished volumes
Ocean freight, inter-island barge, river barge or road — modules travel as complete rooms.
- Step 3
Lifted onto foundations
Engineered foundations, elevated where required, are prepared on site in parallel with production.
- Step 4
Connected and commissioned
Modules join along their long sides; services are connected, systems commissioned and the building handed over.
RESPAND Ownership · Workforce housing
Prefer not to buy the camp?
RESPAND can own it and charge one daily rate per occupied bed for room and board.
Start with step one
Tell us what you need on day one.
Configure online, or send us the site details and we will prepare a proposal.